“Bring back clerk of works” There has never been a better time to undertake the Pearson Edexcel NVQ 6 in Senior Site Inspection

Public bodies need to reduce the gap between themselves and building design teams and to employ a clerk of works on construction projects, according to a Scottish parliamentary committee

The Scottish Parliament’s education and skills committee has published its report into school infrastructure, looking at lessons from the Edinburgh schools fiasco.

It backed calls contained in the earlier Cole Report – the independent investigation headed by architect and construction expert John Cole into the closure of 17 Edinburgh schools because of building defects – that councils should take action to become ‘intelligent clients’.

The committee’s report said it had ‘heard evidence that local authorities had entered into a specific structure for contracts which created a gap between themselves as clients and the design team. We find this unacceptable.’

Public bodies undertaking Design and Build or design, build, finance and maintain contracts should consider employing construction professionals to add quality assurance, the committee said.

It added that a clerk of works could ‘provide the regular inspections necessary to ensure that buildings are built correctly, particularly for work that is subsequently closed up as construction progresses’.

Glasgow architecture professor Alan Dunlop said: ‘A clerk of works should have a day-to-day role in the development of major building projects. That’s how it used to be.

‘The clerk of works had significant responsibility and clout, and reported directly to the architect and client under a traditional building contract or was employed by the client in significant design and build projects after novation, when the design team moved over to work for the contractor.’

He said that the role should be undertaken by an experienced builder, rather than an architect.

The committee undertook its short inquiry in the wake of the collapse of a wall at Oxgangs Primary School in Edinburgh in January 2016 and the subsequent report of the Independent Inquiry into the Construction of Edinburgh Schools led by Cole, which was published last February.

Source: The Architects Journal

The qualification that provides the Clerk of Works with measurable industry accreditation and professional/chartered status is the Pearson Edexcel Level 6 NVQ Diploma in Senior Site Inspection. This qualification Leads to the Black CSCS card, MCIOB through the full professional review and thanks to a collaborative PILOT scheme between the Institute of Clerk of Works and Construction Inspectorate (ICWCI) and CADUK access to Membership of the ICWCI without the need for a professional interview.

Click here to download our profiling tool to find out if you have access to the NVQ Level 6 in Senior Site Inspection

For more information just give us a call on (01952) 292 005 or visit our web site www.caduk.co.uk where you will find all the best information relating to the qualification.

Share this story!